Things are getting exciting in our house. For a long time now we have been saving our pennies and over the next month or two the house is getting a little lift. 4 main areas are going to be covered.
1. Hall floor will become solid wood.
2. Kitchen floor will become tile.
3. Our bedroom will finally be stripped back, painted and a new wardrobe will be introduced.
4. Our spare bedroom will have a wardrobe built into the alcoves.
We may even get the kitchen and spare room ceilings re-skimmed as they are both showing serious signs of wear.
Either way, come the now traditional June party there should be some more DIY to feast your eyes upon.